Setting up a Ready-Mix Concrete Manufacturing Plant

PROJECT DESCRIPTION

Setting up a Ready-Mix Concrete Manufacturing Plant. Ready-Mix Concrete (RMC Plant) with Concrete Blocks, Batching, Mixing & Transporting Concrete

 

Ready-mix concrete (RMC) is a type of concrete which is manufactured in a cement factory, or specifically known as the batching plant, according to a given set of proportions, and then delivered to a work site, by truck mounted with mixers. This results in a precise mixture, allowing specialty concrete mixtures to be developed and implemented on construction sites. Ready mix concrete is sometimes preferred over on-site concrete mixing because of the volume it can produce with precision of proportion of mixtures and also due to reduced work site confusion. Using a pre-determined concrete mixture reduces flexibility, both in the supply chain and in the actual components of the concrete.

Ready mixed refers to concrete that is batched for delivery from a central plant instead of being mixed on the job site. Each batch of ready-mixed concrete is tailor-made according to the specifics of the contractor and is delivered to the contractor in a plastic condition, usually in the cylindrical trucks often known as "cement mixers."

Ready-mixed concrete is particularly advantageous when small quantities of concrete or intermittent placing of concrete are required. Ready-mixed concrete is also ideal for large jobs where space is limited and there is little room for a mixing plant and aggregate stockpiles.

Ready-mixed concrete is often remixed once it arrives at the jobsite to ensure that the proper slump is obtained. However, concrete that has been remixed tends to set more rapidly than concrete mixed only once. Materials, such as water and some varieties of admixtures, are often added to the concrete at the jobsite after it has been batched to ensure that the specified properties are attained before placement.

Ready-mix concrete is also termed as the customized concrete products for commercial purpose. Ready-mix concrete (RMC) refers to concrete that is specifically manufactured for delivery to the customer’s construction site in a freshly mixed and plastic or unhardened state. Concrete itself is a mixture of Portland cement, water and aggregates comprising sand and gravel or crushed stone. In traditional work sites, each of these materials is procured separately and mixed in specified proportions at site to make concrete. Ready-mix concrete is bought and sold by volume – usually expressed in cubic meters (cubic yards in the US).

Advantages of Ready Mixed Concrete:

·         Quality assured concrete: - Concrete is produced under controlled conditions using consistent quality of raw material.

·         High speed of construction- Speed of construction can be very fast in case RMC is used.

·         Reduction in cement consumption by 10 – 12 % due to better handling and proper mixing. Further reduction is possible if mineral admixtures or cementitious materials are used.

·         Versatility in uses and methods of placing: The mix design of the concrete can be tailor made to suit the placing methods of the contractor.

·         Since ready mixed concrete (RMC) uses bulk cement instead of bagged cement, dust pollution will be reduced and cement will be saved.

·         Conservation of energy and resources because of saving of cement.

·         Environment pollution is reduced due to less production of cement.

·         With better durability of structure, their overall service life increase and there is saving in life-cycle cost.

·         Eliminating or minimizing human error and reduction in dependency on labour.

·         Timely deliveries in large as well as small pours.

·         No need for space for storing the materials like coarse and fine aggregate, cement, water and admixtures.

·         No delay due to site based batching plant erection/ dismantling; no equipment to hire; no depreciation of costs.

·         Reduced noise and air pollution; less consumption of petrol and

·         Diesel and less time loss to business.

Uses:

1.       It is used in the construction of bridge, dam etc.

2.       It is used in the construction overhead roads, pools, multistoried building etc.

3.       It can be directly used at the construction site.

4.       It help greater element of automation and precision concrete mixing.

5.       A much higher quality and more constituent uniformity and increase standardization and speed which is done ten times faster as compared to site mixed concrete.

The growing number of infrastructure projects, including bridges, roads, dams, and airport expansion works, especially in developing nations is fueling the demand for ready-mix concrete. The global ready-mix concrete market is thus expected to witness high growth in the coming years. Some of the other reasons behind the growth of the market are high government spending on construction, manufacturing, and power plants, the growing population, and the trend of urbanization.

On the basis of application, the global ready-mix concrete market can be segmented into commercial building, industrial utilities, residential buildings, and infrastructure. The construction of highways, renovation of airports, and construction of dams will lead to the rapid growth of the infrastructure segment. The rise in the budget allocations by governments for infrastructure development will also prove to be beneficial.

The global ready-mix concrete market can be segmented on the basis of geography into Asia Pacific, North America, Europe, and the Rest of the World. Of these, it is most likely that Asia Pacific will lead in the market owing to a growing number of new infrastructural projects in India, Singapore, China, and Thailand. Rapid industrialization and urbanization in these countries are behind the growth of the market in Asia Pacific.

RMC is being increasingly used as a building material for residential & commercial buildings, manufacturing facilities, energy generation plants, roads and runways. Infrastructure development in emerging economies coupled with increasing trend of urbanization are some of the key factors which are expected to drive industry growth over the forecast period.

Growing construction spending in light of urbanization, population growth and government infrastructural plans will increase market growth. The government of India launched smart cities program to create cities equipped with good infrastructure offering high quality of life through smart solutions, which is likely to spur the demand for RMC.

The demand for commercial buildings such as offices, schools, colleges, hospitals and shopping malls is increasing owing to rapid economic development and modernization is expected to fuel market demand over the upcoming years. Moreover, development of new Greenfield airports, metro railway stations, stadiums and national highways will further drive the usage of ready-mix concrete in the future. However, developed infrastructure in countries such as Germany and the U.S. is expected to restrict the usage of RMC and serve as the major challenge for manufacturers over the forecast period.

Growing population and rapid economic development in emerging countries including China, South Korea, and India are expected to propel the demand for construction of commercial buildings such as shopping malls, schools, offices, colleges, banks, and hospitals.

The global ready-mix concrete market is expected to reach USD 954.7 billion by 2024. An increasing number of infrastructure projects including roads, bridges, dams coupled with rapid airport expansion works in emerging countries will fuel growth over the next eight years. Furthermore, rising government spending on power plants, manufacturing facilities, construction infrastructure along with the growing population will augment industry expansion over the upcoming years.

Though the RMC sector in India is growing rapidly at a pace of 25-30 per cent annually the business is still in its infancy – the gap between the organized and unorganized sector wide. In industrialized countries ready mix concrete forms around 70-75 per cent of the market share. With India building up its infrastructure and cities see a spurt in Verticalization the ready mix sector is expected to play an increasingly dominant role mainly because it is seen as the most viable option to speed up construction. RMC is also being increasingly preferred alternative for most real estate developers because site mixed concrete is dependent on the availability of labour.

 

Tags

Production Process of Ready Mix Concrete, Ready-Mix Concrete Manufacturing, Ready Mix Concrete Manufacturing Process Pdf, Ready Mix Concrete Manufacturing Process, Ready Mix Concrete Manufacturing Process PPT, Ready Mix Concrete PPT, Ready Mix Concrete Process Flow Chart, Ready Mix Concrete Batching, Mixing, Transporting, and Handling, Ready-Mix Concrete Production, Ready-Mix Concrete (RMC Plant), Ready-Mix Concrete (RMC Plant) Manufacturing Plant, Concrete Production, Production of Ready-Mix-Concrete, How Ready Mix is Made, Ready-Mix Production, Ready-Mix Concrete Manufacturing Industry, Ready-Mix Concrete Manufacturing Unit, Ready Mixed Concrete Manufacture, Ready-Mixed Concrete Industry, Manufacture of Ready-Mix Concrete, Batching, Mixing & Transporting Concrete, Ready Mix Concrete Manufacturing Process PPT, Ready Mix Concrete Pdf Free Download, Advantages of Ready Mix Concrete Pdf, Ready Mix Concrete Project Report, Production of Ready-Mix Concrete (RMC), Ready-Mix Concrete Manufacturing Business, RMC Plant, Concrete Batching Plant, Concrete Mixing Plant, Commercial RMC Plant, Ready Mix Concrete Plant, Ready Mix Concrete Manufacturing project ideas, Projects on Small Scale Industries, Small scale industries projects ideas, Ready Mix Concrete Manufacturing Based Small Scale Industries Projects, Project profile on small scale industries, How to Start Ready Mix Concrete Manufacturing Industry in India, Ready Mix Concrete Manufacturing Projects, New project profile on Ready Mix Concrete Manufacturing industries, Project Report on Ready Mix Concrete Manufacturing Industry, Detailed Project Report on RMC Plant, Project Report on RMC Plant, Pre-Investment Feasibility Study on RMC Plant, Techno-Economic feasibility study on Ready-Mix Production, Feasibility report on Ready-Mix Production, Free Project Profile on Ready-Mix Production, Project profile on RMC Plant, Download free project profile on Ready-Mix Production, Startup Project for RMC Plant, Project report for bank loan, Project report for bank finance, Project report format for bank loan in excel, Excel Format of Project Report and CMA Data, Project Report Bank Loan Excel, Ready-Mix Concrete, Batching, Mixing & Transporting Concrete, Ready-Mix Concrete Manufacturing, Ready Mix Concrete Plant Business Plan, How to Start a Ready-mixed Concrete Business, Setting up a Concrete Batch Plant, How to Set Up a RMC Plant, How to Start a Ready-mixed Concrete Business, Ready Mix Concrete Plant Business Plan

 

PROJECT AT A GLANCE
COST OF PROJECT MEANS OF FINANCE
Particulars Existing Proposed Total Particulars Existing Proposed Total
Land & Site Development Exp. ********** ********** ********** Capital ********** ********** **********
Buildings ********** ********** ********** Share Premium ********** ********** **********
Plant & Machineries ********** ********** ********** Other Type Share Capital ********** ********** **********
Motor Vehicles ********** ********** ********** Reserves & Surplus ********** ********** **********
Office Automation Equipments ********** ********** ********** Cash Subsidy ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** Internal Cash Accruals ********** ********** **********
Franchise & Other Deposits ********** ********** ********** Long/Medium Term Borrowings ********** ********** **********
Preliminary& Pre-operative Exp ********** ********** ********** Debentures / Bonds ********** ********** **********
Provision for Contingencies ********** ********** ********** Unsecured Loans/Deposits ********** ********** **********
Margin Money - Working Capital ********** ********** ********** ********** ********** **********
TOTAL ********** ********** ********** TOTAL ********** ********** **********
COST OF PROJECT
Particulars Existing Proposed Total
C O S T O F P R O J E C T
Land & Site Development Exp.
Land Area Required ********** ********** **********
Land Development Cost, Boundary Wall, Gate & Road etc. ********** ********** **********
********** ********** **********
Buildings ********** ********** **********
Factory Building - ********** ********** **********
Office Buildings ********** ********** **********
********** ********** **********
Plant & Machineries ********** ********** **********
Indigenous Machineries ********** ********** **********
Erection & Installation ********** ********** **********
Laboratory Equipments ********** ********** **********
Miscellaneous Equipments like pumps, valves, pipeline & fittings ********** ********** **********
Imported Machineries ********** ********** **********
Technical know how ********** ********** **********
********** ********** **********
Office Vehicles ********** ********** **********
Office Automation Equipments (Telephone/ Fax/ Computer) ********** ********** **********
Office Equipment, Furniture plus Other Equipment & Accessories ********** ********** **********
Other Misc. Assets ********** ********** **********
Pre-operative & Preliminary Expenses ********** ********** **********
Provision for Contingencies ********** ********** **********
********** ********** **********
Total Capital Cost of Project ********** ********** **********
Margin Money for Working Capital ********** ********** **********
Total Cost of Project ********** ********** **********
PROFITABILITY AND NET CASH ACCRUALS
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
********** ********** ********** ********** **********
Revenue/Income/Realisation ********** ********** ********** ********** **********
Gross Sales Realisation ********** ********** ********** ********** **********
Less : Excise Duties/Levies ********** ********** ********** ********** **********
Net Sales Realisation ********** ********** ********** ********** **********
Total Revenue/Income/Realisation ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Expenses/Cost of Products/Services/Items ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** ********** ********** **********
Total Nett Consumption ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** **********
Sub Total of Net Consumption ********** ********** ********** ********** **********
Miscellaneous Cost ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** **********
Power/Electricity Expenses ********** ********** ********** ********** **********
Depreciation ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** **********
Repairs & Maintenance Exp. ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** **********
Cost of Output of Goods Sold ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Gross Profit ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Financial Charges ********** ********** ********** ********** **********
Long/Medium Term Borrowing ********** ********** ********** ********** **********
On Wkg. Capital Borrowings ********** ********** ********** ********** **********
Total Financial Charges ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** **********
Total Cost of Sales ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
Tax on Profit ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Added Back ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp. ********** ********** ********** ********** **********
Net Cash Accruals ********** ********** ********** ********** **********
ASSSESSEMENT OF WORKING CAPITAL REQUIREMENTS
Particulars Stk.Prd. Stk.Prd. Operating Years
1st Year 2nd Yr&+ 1-2 2-3 3-4 4-5 5-6
Capacity Months Months % ********** ********** ********** ********** **********
CURRENT ASSETS ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Raw Material Cost ********** ********** ********** ********** **********
Indigenous ********** ********** M ********** ********** ********** ********** **********
Lab & ETP Chemical ********** ********** M ********** ********** ********** ********** **********
Packing Material ********** ********** M ********** ********** ********** ********** **********
Consumable Store ********** ********** M ********** ********** ********** ********** **********
Work-in-Process ********** ********** D ********** ********** ********** ********** **********
Finished Goods ********** ********** M ********** ********** ********** ********** **********
Current Expenses ********** ********** M ********** ********** ********** ********** **********
Receivables ********** ********** M ********** ********** ********** ********** **********
********** ********** ********** ********** ********** ********** **********
Total ********** ********** ********** ********** **********
Cash/Bank Balances ********** ********** ********** ********** **********
Gross Wkg. Capital ********** ********** ********** ********** **********
********** ********** ********** ********** **********
PROFITABILITY RATIOS, DSCR, DEBT EQUITY
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Profit Percentages to Net Sales
Gross Profit ********** ********** ********** ********** **********
% Of G.P. to Net Sales ********** ********** ********** ********** **********
Net Profit Before Taxes ********** ********** ********** ********** **********
% of N.P.B.T. To Net Sales ********** ********** ********** ********** **********
Net Profit After Taxes ********** ********** ********** ********** **********
% of N.P.A.T. To Net Sales ********** ********** ********** ********** **********
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Exp ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations
Repayment of Long/Medium Ter ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
Parameters
Initial Equity Capital ********** ********** ********** ********** ********** **********
Credit Balance in P & L ********** ********** ********** ********** ********** **********
Total Capital excl Unsec Deposits ********** ********** ********** ********** ********** **********
Unsecured Dep. ********** ********** ********** ********** ********** **********
Total Equity incl Unsecured Deposits ********** ********** ********** ********** ********** **********
Long/Medium Term Borrowings from Bank ********** ********** ********** ********** ********** **********
Term lia. Incl Unsecured Deposit ********** ********** ********** ********** ********** **********
Total Liabilities ********** ********** ********** ********** ********** **********
Total Liabilities incl Unsecured Deposits ********** ********** ********** ********** ********** **********
DEBT EQUITY RATIO considering
i.e.Total Term Lia./NW
Unsecured Dep. as Equity ********** ********** ********** ********** ********** **********
Unsecured Dep. as Debt ********** ********** ********** ********** ********** **********
Total Outside Lia./NW ********** ********** ********** ********** **********
Assets Turnover Ratio (x) ********** ********** ********** ********** **********
No. of Shares of 10.00 each ********** ********** ********** ********** **********
Earnings Per Share (EPS) (in `) ********** ********** ********** ********** **********
Proposed divident ********** ********** ********** ********** **********
Cash EPS (in `) ********** ********** ********** ********** **********
Dividend Per Share(DPS) (in `) ********** ********** ********** ********** **********
Payout Ratio (%Age) ********** ********** ********** ********** **********
Retained Earnings/Share (in `) ********** ********** ********** ********** **********
Retained Earnings (%Age) ********** ********** ********** ********** **********
Book Value Per Share (in `) ********** ********** ********** ********** **********
Debt Per Share (in `) ********** ********** ********** ********** **********
Probable Mkt.Price/Share(in `) ********** ********** ********** ********** **********
Price / Book Value (x) ********** ********** ********** ********** **********
Price Earnings Ratio (x) ********** ********** ********** ********** **********
Yield (%Age) ********** ********** ********** ********** **********
BREAK EVEN ANALYSIS
Particulars Operating Years
Ratio 1-2 2-3 3-4 4-5 5-6
BREAK EVEN ANALYSIS
Total Value of Output ********** ********** ********** ********** **********
Variable Cost & Expenses
Raw Material Cost ********** ********** ********** ********** ********** **********
Lab & ETP Chemical Cost ********** ********** ********** ********** ********** **********
Packing Material Cost ********** ********** ********** ********** ********** **********
Sales Commission/Exp. ********** ********** ********** ********** ********** **********
Sub-total ********** ********** ********** ********** **********
Less:W.I.P. Adjustments ********** ********** ********** ********** **********
Total Variable Cost ********** ********** ********** ********** **********
Net Contribution ********** ********** ********** ********** **********
Profit Volume Ratio (%) ********** ********** ********** ********** **********
Semi-Var./Semi-Fixed Exp.
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Interest on Wkg.Capital ********** ********** ********** ********** ********** **********
Tot.Semi-Var./Fixed Exp. ********** ********** ********** ********** **********
**********
Fixed Expenses / Cost **********
Miscellaneous Cost ********** ********** ********** ********** ********** **********
Employees Expenses ********** ********** ********** ********** ********** **********
Power/Electricity Expen ********** ********** ********** ********** ********** **********
Fuel Expenses ********** ********** ********** ********** ********** **********
Royalty & Other Charges ********** ********** ********** ********** ********** **********
Repairs & Maintenance E ********** ********** ********** ********** ********** **********
Other Mfg. Expenses ********** ********** ********** ********** ********** **********
Administration Expenses ********** ********** ********** ********** ********** **********
Selling Expenses ********** ********** ********** ********** ********** **********
Intrest-Fixed Borrowing ********** ********** ********** ********** ********** **********
Intrest-Working Capital ********** ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** ********** **********
Deferred Expenses W/Off ********** ********** ********** ********** ********** **********
Total Fixed Expenses ********** ********** ********** ********** **********
Tot.Fixed/Semi-Fixed Exp ********** ********** ********** ********** **********
Tot.Cash Fixed/SemiFixed ********** ********** ********** ********** **********
Cash Break Even Sales ********** ********** ********** ********** **********
Cash Margin of Safety ********** ********** ********** ********** **********
Break Even Sales ********** ********** ********** ********** **********
Margin of safety ********** ********** ********** ********** **********
At Maximum Utilisation : Year ********** ********** ********** ********** **********
(as % of Installed Capacity)
Cash B.E.P. : % xx% xx% xx% xx% xx%
B.E.P. : % xx% xx% xx% xx% xx%
M E A N S O F F I N A N C E

Equity Share Capital

********** ********** **********

Others - Preference Share Capital

********** ********** **********
Total Equity Share Capital ********** ********** **********
********** ********** **********

Long/Medium Term Borrowings

********** ********** **********
FROM BANK ********** ********** **********
From Other Financial Institutions ********** ********** **********
Total Long/Medium Term Borrowings ********** ********** **********
********** ********** **********

Total Means of Finance

********** ********** **********
INTEREST AND REPAYMENT ON TERM LOANS
A Name of Institution-Bank ABC BANK
B Term Borrowing Amount ********** xx
C Repayment Term (Years) ********** Years
D Repayment Instalments ********** Instalments
E Repayment Commencement Year - 0; 3rd Qtr.
F Rate of Interest(General) xxxx% p.a.
F Rate of Interest(Initial) 0.00% p.a.
G Apply Gen. Int. Rate from Year x Quarter :: x
H Interest Calculation Quarterly
Debt Service Coverage Ratio
Funds Available to Service Debts
Net Profit After Taxes ********** ********** ********** ********** **********
Depreciation Charges ********** ********** ********** ********** **********
Technical Knowhow Fees & Expenses ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
Debt Service Obligations ********** ********** ********** ********** **********
Repayment of Long/Medium Term ********** ********** ********** ********** **********
Interest on Long/Medium Term ********** ********** ********** ********** **********
T o t a l ********** ********** ********** ********** **********
********** ********** ********** ********** **********
D. S. C. R. (Individual) ********** ********** ********** ********** **********
D. S. C. R. (Cumulative) ..... ********** ********** ********** ********** **********
D. S. C. R. (Overall) ........ ********** ********** ********** ********** **********
DEPRECIATION CHARGES AS PER BOOKS (TOTAL)
Operating Year F.Assets Type A-1 F.Assets Type A-2 F.Assets Type B F.Assets Type C F.Assets Type D-1 F.Assets Type D-2 Total
Particulars Factory Building - Office Buildings PLANT & MACHINERY Office Vehicles Office Automation Equipments (Telephone/ Fax/ Computer) Furniture & Fixtures
1-2 ********** ********** ********** ********** ********** ********** **********
2-3 ********** ********** ********** ********** ********** ********** **********
3-4 ********** ********** ********** ********** ********** ********** **********
4-5 ********** ********** ********** ********** ********** ********** **********
5-6 ********** ********** ********** ********** ********** ********** **********
Particulars Method Deprn.Rate Part Consideration (for Asset put to use less than xx months)
Type A :: Buildings
Factory Building - WDV ********** **********
Office Buildings WDV ********** **********
Type C
Office Vehicles WDV ********** **********
Type D :: Misc. Fixed Assets
Office Automation Equipments (Telephone/ Fax/ Computer) WDV ********** **********
Furniture & Fixtures WDV ********** **********
Projected Pay Back Period
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Year 1 2 3 4 5
Initial Investment *********
Total Initial Investment *********
Yearly Cash Flow ********* ********* ********* ********* *********
Accumulated Cash Flow ********* ********* ********* ********* *********
Pay Back Period xx Years xx Months xx Years xx months
Projected IRR
Year CFAT PV factor @**% *********
Initial Investment ********* ********* *********
1-2 ********* ********* *********
2-3 ********* ********* *********
3-4 ********* ********* *********
4-5 ********* ********* *********
5-6 ********* ********* *********
Total PV ********* *********
IRR ********* *********
PROJECTED BALANCE SHEET
Particulars Operating Years
1-2 2-3 3-4 4-5 5-6
Equity Share Capital ********** ********** ********** ********** **********
Surplus of Previous Year ********** ********** ********** ********** **********
Add : Net Profit After Taxes ********** ********** ********** ********** **********
Surplus at the End of Year ********** ********** ********** ********** **********
Unsecured Deposits ********** ********** ********** ********** **********
Long/Medium Term Borrowings Proposed-FROM BANK ********** ********** ********** ********** **********
Bank Borrowing for Wkg. Capital ********** ********** ********** ********** **********
Current Liabilities ********** ********** ********** ********** **********
Sundry Creditors ********** ********** ********** ********** **********
Other Current Liabilities ********** ********** ********** ********** **********
Total Current Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Liabilities ********** ********** ********** ********** **********
********** ********** ********** ********** **********
A S S E T S ********** ********** ********** ********** **********
Fixed Assets ********** ********** ********** ********** **********
Gross Block ********** ********** ********** ********** **********
Less : Depreciation to Date ********** ********** ********** ********** **********
Net Block ********** ********** ********** ********** **********
Current Assets ********** ********** ********** ********** **********
Stocks on Hand ********** ********** ********** ********** **********
Receivables ********** ********** ********** ********** **********
Other Current Assets ********** ********** ********** ********** **********
Cash and Bank Balances ********** ********** ********** ********** **********
Total Current Assets ********** ********** ********** ********** **********
P & P Exp. and/or Other Dvp.Exp. ********** ********** ********** ********** **********
(To The Extent Not W/Off) ********** ********** ********** ********** **********
Other Non Current Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
Total of Assets ********** ********** ********** ********** **********
********** ********** ********** ********** **********
ROI (Average of Fixed Assets) ********** ********** ********** ********** **********
RONW (Average of Share Capital) ********** ********** ********** ********** **********
ROI (Average of Total Assets) ********** ********** ********** ********** **********
COMPANY SUMMARY

NIIR PROJECT CONSULTANCY SERVICES (NPCS)is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Selection of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

REASONS FOR BUYING THE REPORT
  1. This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  2. This report provides vital information on the product like its definition, characteristics and segmentation.
  3. This report helps you market and place the product correctly by identifying the target customer group of the product.
  4. This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  5. The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
OUR APPROACH
  1. Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  2. The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  3. We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.
TABLE OF CONTENT
Introduction
Project Introduction
Project Objective and Strategy
Concise History of the Product
Properties
BIS (Bureau of Indian Standards) Provision & Specification
Uses & Applications

Market Study and Assessment
Current Indian Market Scenario
Present Market Demand and Supply
Estimated Future Market Demand and Forecast
Statistics of Import & Export
Names & Addresses of Existing Units (Present Players)
Market Opportunity

Raw Material
List of Raw Materials
Properties of Raw Materials
Prescribed Quality of Raw Materials
List of Suppliers and Manufacturers

Personnel (Manpower) Requirements
Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

Plant and Machinery
List of Plant & Machinery
Miscellaneous Items
Appliances & Equipments
Laboratory Equipments & Accessories
Electrification
Electric Load & Water
Maintenance Cost
Sources of Plant & Machinery (Suppliers and Manufacturers)

Manufacturing Process and Formulations
Detailed Process of Manufacture with Formulation
Packaging Required
Process Flow Sheet Diagram

Infrastructure and Utilities
Project Location
Requirement of Land Area
Rates of the Land
Built Up Area
Construction Schedule
Plant Layout and Requirement of Utilities

FINANCIAL PLAN
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR
INFORMATION/ DISCLAIMER
  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.
Setting up a Ready-Mix Concrete Manufacturing Plant
Capacity 0 Plant and Machinery cost 0.00 Lakhs
Working Capital 0.00 Rate of Return (ROR) 0.00 %
Break Even Point (BEP) 0.00 % TCI 0.00 Lakhs
Cost of Project 0.00Lakhs
Add to Inquiry Basket Download Page as PDF.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR